Skip to content
HNROS Help Center
English
Start free
Contents1. What is this window for?2. Ten tabs, three groups3. Purchasing: from request to order4. Incoming quality (IQC): accepting a batch5. NCR / MRB: the nonconformance record6. Devices: calibration and the production lock7. RMA / Service: goods coming back8. Support and Dispatch: tickets and field jobs9. Subscriptions: invoices that issue themselves10. Costing (K-6): spreading overheads onto products11. HR: leave, advances, assets12. When the system stops you13. Frequently asked questions14. Glossary16. Purchasing › "Below Minimum": what to buy, how many, from whom?17. Currency on the supplier card and the default rate on purchase documents18. Purchase return and sales return: which permission, which operation?19. Supplier scorecard: the "Last 90 days" column, cache and paging20. New scorecard columns: OTIF, subcontract scrap, VDA 6.3 class and composite score15. Purchasing, IQC, and device evidence

Departments — A Guide from Scratch for the Back Office

This window does not do one job; it holds the ledgers of ten different departments side by side. Do not be alarmed: nobody uses all ten. Read the section that matches your job and skip the rest. Still, everyone should read Sections 1 and 2 — knowing where each kind of work lives prevents records being opened in the wrong place.

1. What is this window for?

Sales and production are the visible part of a business. Behind them other work runs: materials are purchased, incoming goods are inspected, defective output is documented, customer faults are logged, technicians are dispatched, monthly subscriptions are invoiced. Each of these needs a record with a beginning and an end — otherwise the work stays verbal and gets forgotten.

💡 The shared logic

All ten tabs follow the same rhythm: open → work → close. A record is opened (request, ticket, NCR, RMA…), somebody takes it, a decision is made, the record closes. The pattern you learn in one tab holds in the others.

2. Ten tabs, three groups

📷 Actual screenDepartmanlar penceresi — sekme çubuğu 🗺 What each field does WHICH WORK, WHICH TAB? AS GOODS COME IN (supply chain) Purchasing Incoming quality (IQC) Costing (K-6) HR (leave, advance, assets) WHEN SOMETHING GOES WRONG (quality) NCR / MRB Devices (calibration) RMA / Service AFTER THE SALE (customer lifecycle) Support (tickets) Dispatch (field jobs) Subscriptions

Figure 1 — Find your group; you can do your job without ever opening the other two.

3. Purchasing: from request to order

Nobody orders directly. First a request is raised ("we need 30 kg of adhesive"), then quotes are collected from suppliers, placed side by side, and one is selected. The moment you select, the request becomes an order. Those three steps are the permanent answer to "why did we buy from this supplier?".

📷 Actual screenSatın Alma sekmesi — talepler ve teklif kıyas 🗺 What each field does REQUEST → QUOTE COMPARISON → ORDER + NEW REQUEST stock code, quantity, deadline, requester ADD QUOTES (at least 3) supplier · price · payment term · deadline "No quotes yet" means there is nothing to compare SELECT → ORDER "Quote selected — request became an order" The cheapest quote is not always the best: a long payment term keeps cash in your pocket, a short lead time keeps production running. The comparison screen shows all three side by side; the decision is yours. SUPPLIER SCORECARD: rate each supplier 0-100 — on-time delivery, quality, price. Next time, that score does the talking.

Figure 2 — A request can be deleted and quotes edited; but once a quote is selected the record becomes an order.

4. Incoming quality (IQC): accepting a batch

Goods have arrived from the supplier. You cannot measure every piece; you take a sample, check it against the acceptance criteria and give one of two decisions: Accept or Reject. Releasing accepted goods from quarantine is a separate step:

Goods taken into a quarantine warehouse (Incoming Goods receipt, purchase goods receipt or a direct purchase invoice) fall into the IQC list automatically with a "Waiting" record, even without acceptance criteria; you do not need to open one by hand. A second record is not opened for the same document and product; the decision is made on the record in the list. If no specification limits are defined, the 3.1 gate says "not applied" instead of a green pass.

✅

Accept

The batch met the criteria. When you write the Accept decision, the “Release the goods → target warehouse” box is ticked by default; while it is ticked, the decision and the release are made in a single request, the goods move to the target warehouse and the “Lot accepted” notification appears. If you leave the box unticked the goods stay in quarantine; if the release is refused (for example, a certificate is missing) the decision is still written but the goods stay in quarantine and the screen says “Lot accepted; the goods stayed in quarantine”.

⚠️

Release from quarantine

Accepted goods that stayed in quarantine are released with the Release from quarantine button on the row in the IQC list. The quantity that can be released is only the accepted quantity: after a partial release the button becomes “Release from quarantine (remaining {miktar})” and once everything is released the row says “Released”. A batch with no decision yet (pending) cannot be released; the screen says “… has no incoming quality decision yet; the goods cannot be released. First give a decision on the Departments › Incoming Quality (IQC) tab.”

⛔

Reject

A rejection reason is mandatory. A Reject decision opens an NCR form; the goods go back to the supplier and show on the supplier’s scorecard, but the return runs separately: it is done with the MRB decision (Quality › NCR) or with a purchase return document. Rejected goods cannot be moved to a sellable warehouse; their way out is scrap or a quarantine-type return warehouse. If no reason is written, the same fault will come again from the same supplier.

📏 Criteria and sample size

Acceptance criteria are defined once per item (dimension, tolerance, instruction/AQL). If it says "no criteria defined", the inspector has no idea what to look at — enter the criteria first. Sample size is how many pieces you measure from the batch; even a large batch need not be measured completely, but too small a sample makes the check meaningless.

The CoC required box in the criteria form is visible only when Production Preferences › Product / lot certificate is on. While the preference is off the box is hidden, the rule does not run even if an old flag remains on the criterion, and the list shows no CoC required badge.

When an IQC acceptance is stopped by the certificate requirement, the row’s Documents panel opens by itself and starts with the Certificate (CoC) link section: Link to this acceptance a registered certificate, link it by typing its number, or upload its file. The IQC list row shows the lot that came in with the acceptance (supplier lot in brackets) and the CoC state. Details: Quality › The certificate link in IQC acceptance.

5. NCR / MRB: the nonconformance record

An NCR (nonconformance report) says "something did not meet the standard" — in incoming goods, in production or at the customer. The MRB is the verdict on that nonconformance: use it, rework it, scrap it, return it.

⚠ Some NCRs open by themselves

When a rework quantity is entered during a production confirmation, the program opens an NCR automatically. This is not a bug: every reworked piece is by definition a nonconformance. What is expected from you is to write the reason and give the MRB verdict. To open one by hand use + Manual NCR.

6. Devices: calibration and the production lock

Callipers, scales, torque wrenches… Every measuring device has a calibration expiry date. A measurement taken with a drifted calliper is more dangerous than no measurement at all — it creates false confidence.

🔒 This lock lives on the server

A device past its calibration date cannot be selected in a production confirmation. This rule runs on the server, not in the interface, so there is no screen you can go around it from. You will see DUE SOON and EXPIRED badges — book the calibration the day you see "due soon", so production never stops.

📏 The same lock applies to MSA, SPC, Final inspection and confirmation

An instrument whose calibration end date is before today is refused not only in production confirmation but also in Final inspection, when opening an MSA study or adding a measurement, and when entering an SPC measurement (the end date itself is still valid). The message says “{instrument} calibration expired on {dd.mm.yyyy} — renew the calibration in Departments › Instruments”. In MSA and SPC the instrument picker shows an expired instrument in red (“⚠ calibration … expired”), the Start / Save button is disabled and the reason is shown. Confirmation and Final inspection have no override.

In MSA and SPC only an administrator can continue with Start anyway (with reason) / Save anyway (with reason): a reason of at least 5 characters is written to the access log and the record is marked “out of calibration”. Such an MSA result is not written to the instrument's MSA status (“Invalid instrument” badge), and the SPC analysis leaves these measurements out of the capability calculation. If a user who is not an administrator tries the override, the message says that Administrator permission is required and that it is assigned in Settings › Users.

7. RMA / Service: goods coming back

A customer sent goods back. Open a record with + New RMA: which product, which serial number, what the fault is. Then add service lines — each job done and its fee is its own line. When finished, the record closes in one of two ways: completed (repaired) or returned (money or product given back).

💡 Free-of-charge production order

If the product cannot be repaired you can raise a free-of-charge production order: a one-unit order is created for the part complained about (an active recipe is required). The replacement's cost is then on record — this is where "what does warranty cost us?" gets answered. If the record has no stock code the program warns you: put the part code on the record first.

8. Support and Dispatch: tickets and field jobs

When a customer calls saying "it does not work", open + New ticket: subject, priority, account. The ticket is handed to someone with Take/Assign, and when solved you write a resolution note and close it. If the job cannot be done remotely, raise a field job from the Dispatch tab and assign it to a team.

📷 Actual screenDestek sekmesi — biletler ve SLA 🗺 What each field does SLA — THE PROMISED RESOLUTION TIME (assigned automatically) URGENT 4 hours IMPORTANT 24 hours NORMAL 72 hours When time runs out a red "SLA BREACHED" badge appears on the ticket — the trace remains even after closing. Choose the priority honestly: if every ticket is "urgent", none of them is.

Figure 3 — Field jobs go to the installation team, who see them under My jobs in the /saha app.

9. Subscriptions: invoices that issue themselves

Maintenance packages, rent, annual service contracts… Invoicing the same amount by hand every month wastes time and invites forgetting. With + New subscription you enter the account, the monthly amount and the commitment (months); the system checks every six hours and invoices active subscriptions not yet billed this month. If you do not want to wait there is an Issue monthly invoices now button.

🔄 Renewal opportunity

Subscriptions nearing the end of their commitment are flagged RENEWAL and an opportunity is opened automatically in CRM. That way a contract never expires quietly; it lands on a salesperson's desk. The list shows each subscription's last invoiced month.

10. Costing (K-6): spreading overheads onto products

A chair's cost is not just wood and screws: factory rent, electricity and the foreman's wage all take a share. These are overheads, and they cannot be booked to a single product directly. This tab spreads the monthly cost pool onto products by one of two methods:

📷 Actual screenMaliyet sekmesi — gider havuzu ve dağıtım 🗺 What each field does COST POOL → OVERHEAD PER UNIT POOL monthly overhead rent + power + … METHOD 1: MACHINE-MINUTES the longer on the machine, the bigger the share METHOD 2: UNIT COUNT every unit takes an equal share — simple but crude FULL COST unit cost + unit overhead the selling price is built on this If the report says "no production confirmations this month" there is nothing to spread onto — the pool is not distributed into thin air. "No cost pool defined for this year" → enter the pool amount first.

Figure 4 — Without spreading overheads every product looks more profitable than it is; price on that and you sell at a loss.

11. HR: leave, advances, assets

Three simple records: leave (start and end dates are required), advance (an amount is required) and assigned assets (items given to staff — laptop, phone…). The aim is not payroll but answering "who is on leave" and "who has which equipment".

🔐 HR records are not open to everyone

This tab is open only to the system administrator. Without the right you see "HR records are restricted to the system administrator". That is not a fault but a deliberate boundary — pay and leave data are personal information.

12. When the system stops you

Message Why Fix
A device past calibration cannot be used The measurement would not be trustworthy Calibrate it and enter the new date, or pick another device
A nonconformance reason is required A reasonless NCR is useless later Write what happened in one sentence
No criteria defined IQC does not know what to check Enter dimension/tolerance under acceptance criteria
The RMA has no stock code There is no product to raise the free order for Put the part code on the record first
No cost pool defined for this year No amount was entered to distribute Enter the monthly overhead in the Pool field
Restricted to the system administrator A permission boundary (e.g. HR) Ask your administrator — this is not a fault

13. Frequently asked questions

Can I order without raising a request?

Technically yes, from the orders window — but then there is no record of why you chose that supplier. Quote comparison both strengthens your hand in negotiation and answers the auditor's "did you get three quotes?".

What is the difference between an NCR and an RMA?

An NCR stays inside: something failed the standard and we decide what to do. An RMA comes from outside: a customer sent goods back and we must deal with it. An RMA usually spawns an NCR too — but not the other way round.

Can a subscription be invoiced twice?

No. Each run looks only for subscriptions not yet invoiced this month and skips the rest. Pressing "issue now" twice does nothing the second time. The list shows each subscription's last invoiced month.

I closed the ticket but the SLA shows breached — can I remove it?

No, and it should not be possible. A breach says something in the process failed; delete it and the same delay repeats silently. The right response is to write why it was late in the resolution note — if you see a repeating pattern three months later, you have found the real cause.

14. Glossary

TürkçeEnglishBahasa Indonesia
Satın alma talebiPurchase requestPermintaan pembelian
Teklif kıyasQuote comparisonPerbandingan penawaran
Tedarikçi karnesiSupplier scorecardRapor pemasok
TerminLead time / deadlineTenggat
Vade (gün)Payment term (days)Tempo bayar (hari)
Giriş kalite (IQC)Incoming quality controlPemeriksaan mutu masuk
Kabul kriterleriAcceptance criteriaKriteria penerimaan
Şartlı kabulConditional acceptancePenerimaan bersyarat
NCR (uygunsuzluk)Nonconformance reportLaporan ketidaksesuaian
MRB kararıMaterial review board decisionPutusan dewan tinjau material
Yeniden işlemeReworkPengerjaan ulang
HurdaScrapBarang buangan
Kalibrasyon SKTCalibration expiryKedaluwarsa kalibrasi
RMAReturn authorisationOtorisasi pengembalian
Servis satırıService lineBaris servis
Bedelsiz üretim emriFree-of-charge work orderPerintah produksi tanpa biaya
BiletSupport ticketTiket dukungan
SLAService level agreementPerjanjian tingkat layanan
DispatchField dispatchPenugasan lapangan
Abonelik / taahhütSubscription / commitmentLangganan / komitmen
Gider havuzuCost poolKumpulan biaya
Birim ek yükOverhead per unitOverhead per unit
Tam maliyetFull costBiaya penuh
ZimmetAssigned assetAset yang dipegang

16. Purchasing › "Below Minimum": what to buy, how many, from whom?

This card used to belong to the Warehouses window and only a manager could fill it; a buyer got 403. It now opens in the Purchasing tab with the purchasing (supplier) permission; no warehouse right is needed. The rule is unchanged: if the stock card's minimum level is above the overall on-hand, the row is listed — but the context a buyer needs has been added.

Column Where it comes from
In transit Sum of open purchase order lines — you ordered, the goods have not arrived yet.
Suggestion min − on hand − in transit, never below zero. Without subtracting in-transit you would order the same goods twice.
Last supplier / price The supplier, date, price and discount on the latest real purchase invoice for this code (production, transfer and stock-count slips do not count).
Request badge Count of open purchase requests or supplier quotes for this code — check before opening another request.

How to use it: the Open request button on the row opens the request form pre-filled with the suggested quantity and writes the in-transit amount into the reason; if an open request exists the button's tooltip warns you. The filter box searches code, description and supplier name. The list is cached for 60 seconds — if the purchase invoice you just wrote does not show up, press the card's Refresh button (fresh calculation).

17. Currency on the supplier card and the default rate on purchase documents

A company buying abroad had to choose the currency by hand on every purchase invoice — slow and error-prone. A Currency field was added to the account card's Edit form (and "Currency (blank = TL)" when creating a new card). Two to ten letters, converted to upper case: USD, EUR, GBP… Leave it blank for TL.

What happens on the document: if a purchase document (purchase or purchase return) is written without any currency — usually an integration or API call — the supplier's currency is taken; if it is not TL and no rate was given, the day's central-bank buying/selling rate is filled in. The response's "dovizVarsayilan" block states the source (supplier), the rate and its date. If no rate can be found the document is not written; 422 asks for "gkur/tkur" — stopping is better than silently writing a 1/1 rate. Documents typed in the entry window are unaffected because the window always sends the currency explicitly; the default is not applied on the sales side.

18. Purchase return and sales return: which permission, which operation?

Return invoices are reversed in stock direction: a sales return is a goods receipt, a purchase return a goods issue. Because the old rule looked only at stock direction, a salesperson needed the purchase right and a buyer the sales right — the wrong gate. Now a return invoice is issued with the permission of its own commercial area: faturacikis (sales) for a sales return, faturagiris (purchase) for a purchase return. The refusal message names the required right: "No invoice in/out permission — … belongs to the PURCHASE area, the 'faturagiris' right is required".

For those writing via the API: the operation type on the document-write endpoint now has four values — alis, satis, alis-iade, satis-iade. The old "satis + invoice kind 2" form keeps working; an inconsistent combination is refused with a message naming the right operation ("Use islem:'alis-iade' for a purchase return"). Returns are valid only for invoices; orders and quotes return 422.

19. Supplier scorecard: the "Last 90 days" column, cache and paging

The scorecard table gained a Last 90 days column: document count, purchase amount and return amount — independent of the selected year, always 90 days back from today. It answers "how much did we work with this supplier last quarter?". The scorecard is now cached for 60 seconds and recalculates by itself when the purchase invoice, IQC, NCR, quarantine or rating tables change; if you still want "now", the Refresh button forces a fresh calculation. Long lists are paged: above the scorecard table you get page arrows (‹ ›), a rows-per-page selector (25/50/100/250 — default 50) and a “51–100 / 232” style total counter.

For those working from the Corporate window the same information exists as a single-supplier summary: the supplier 90-day summary (purchase/return, IQC accept-reject ratio, NCR, quality rejections, rating and score). Details in the Corporate guide. When a purchase request is written, the response now returns the request's sequence number — the "Open request" notice from MRP shows that number.

🔗 Related guides

For production confirmation and rework see the Production guide, for goods entering the warehouse the Warehouse guide, and for approval thresholds the Cockpit guide.

20. New scorecard columns: OTIF, subcontract scrap, VDA 6.3 class and composite score

🔍 Supplier audit and the EDI ledger

Two more buttons sit above the purchasing tab: Supplier Audit (VDA 6.3) — open an audit, score questions with 0/4/6/8/10, see the elements and the class, close it; and the EDI Ledger — receive the customer's order/release message, process it, and see the order draft and production requests it produced. For details see sections 11 and 12 of the PPAP and SPC guide.

15. Purchasing, IQC, and device evidence

Attach work instructions, control plans, and specifications to IQC criteria; certificates, CoC/CoA, inspection/measurement reports, and delivery note to IQC receipt; and calibration certificate/test report to the measuring device. For subcontract dispatch/return, keep ASN, CoC/CoA, certificate, PPAP, proof of delivery, and return inspection under the same subcontract pack.

Do not delete an expired certificate; upload a new attachment with new validity. Lot, supplier, document number, and acceptance decision must point to the same record. Field guide: Practical User Handbook.

HNR Help Center · Departments · This page is updated together with the program. Report anything missing or wrong to your system administrator.

Related guides