Contents1. What MES is for2. Setup: station, token, operator3. Operator terminal4. Confirmation and gates5. Downtime and scrap reason codes6. Andon call7. Live OEE8. Production board and TV mode9. Downtime and scrap Pareto10. Shift handoverAn invalid day in the shift handover11. Efficiency scorecard and piece-rate bonus12. On a phone13. Permissions14. MessagesWho can change the settings in this windowPIN on the terminal: lock and changeMES tabs on the phone

MES — Operator Terminal, Live OEE and Andon

1. What MES is for

MES (manufacturing execution) connects the shop floor to the office. The operator at the machine starts, pauses and finishes the job from a terminal; who did what, when, on which operation and for what reason is recorded. From these records come live OEE, the daily production board, downtime and scrap Pareto, Andon calls, the shift handover report and the operator/shift/machine efficiency scorecard.

The window has seven tabs: Production board · OEE · Pareto · Andon · Shift handover · Efficiency scorecard · Definitions. The operator terminal is a separate window (Operator terminal) and its full-screen address is /terminal.

2. Setup: station, token, operator

A new station token is shown on screen only once and hides itself after 2 minutes; if you did not copy it, get a new token from Definitions and reconnect the device.

🔗 Device token: connect once, the device stays linked

On the terminal's Connect screen the station code and station token are checked only once; the program gives the device its own device token and the device stays linked to the station. The station token is not kept on the device and is not asked for again; terminal sign-in works only with the device token. You may type a Device name (suggestion: browser · operating system); the device appears under that name in the list.

The Linked devices (n) column on Definitions › Stations lists the devices linked to each station: name, who linked it, last seen and the day it will drop. Unlink device (asks for confirmation) removes the link of that device only and closes the operator session opened from it; the other devices keep working. Renew token removes the link of all devices linked to the station (it asks for confirmation when there are devices); the devices must connect again with the new token. A device not seen for 180 days is unlinked automatically; deleting or deactivating the station also drops the links. These actions require the definitions permission.

On a phone, a user with the definitions permission gets a fourth Stations tab in the MES window: the same linked-devices list and Unlink device work in a card layout.

3. Operator terminal

The terminal is drawn for a touch screen with large buttons (at least 64 pixels). When idle it shows the My jobs today list (the official APS schedule for this machine, otherwise the work-order due-date order) and a QR field. Tapping a job or scanning its code starts it.

ButtonWhat it does
StartStamps "I started" on the operation (the same field as Stuck Work, the first stamp is kept). If there is an open hold it is refused with BLOKE_ACIK. One job runs on a station at a time.
PauseAsks for the downtime reason. A machine downtime record is opened; APS sees the machine as closed in its next calculation. Depending on the reason an Andon call and a Stuck Work hold are suggested.
ResumeCloses the downtime with its real duration; the job continues where it left off.
Finish / report quantityEnter the good quantity, the rework quantity and scrap with a reason code; if "This operation is complete" is ticked the operation is closed. Net running time (pauses excluded) is calculated automatically.
Start / end downtimeStation downtime while no job is running (breakdown, no material, break…).
AndonCalls maintenance, warehouse, quality or the foreman (see section 5).

When you change your PIN on the terminal (“You need to change your PIN” on first sign-in) the PIN must be 4–6 digits; a repeated digit (0000) and consecutive digits (1234, 4321) are refused. The missing conditions are counted under the field and the sentence “The new PIN does not meet the rule (n conditions missing)” appears. The same rule applies to the personnel-portal and subcontractor-portal PINs.

4. Confirmation and gates

Finishing on the last operation (or on a work order with no operations at all) writes the existing production confirmation: the good quantity is received into stock, components are consumed, labour and piece-rate are calculated and the selected mould's shot counter increases. Intermediate operations do not write a confirmation — so that the product does not enter stock twice, their quantity and time are kept only in the MES record.

The confirmation gates work as they do on the desktop. On the four gates whose escape does not need a manager (negative stock, scrap overrun, plan overrun, expiry date) the terminal shows the text of the gate and asks for a reason of at least 5 characters (“Write a reason of at least 5 characters for this approval; the reason is recorded in the transaction log.”); while the reason is empty or too short, the approve button is disabled. The operator types the reason and resends with an explicit approval (“…I approve, send again”); the reason is written into the confirmation note and the MES record. Gates that require a block release, a competency or a manager approval cannot be passed from the terminal — the supervisor confirms from the desktop. When a gate refuses, the station stays operational.

5. Downtime and scrap reason codes

Downtime reasons form a tree: Planned (break, planned maintenance, meeting, no planned production) and Unplanned (machine breakdown → mechanical / electrical, no material, mould change, adjustment, quality, no staff, other). Planned downtime is not deducted from OEE availability. Each reason can carry an Andon type and a Stuck Work reason code; scrap reasons are grouped into the 5M classes (material, machine, operator, method, measurement). On the Definitions tab you add codes, deactivate them and add the plastics / metal / textile / food sector templates with one button.

6. Andon call

The red Andon button on the terminal calls one of four teams: maintenance, warehouse, quality, foreman. The call number comes from the document series (AN2026000001) and goes out as an urgent HNROS message. Recipients are the users in Definitions › Andon recipients; if that field is empty, users with the related permission (maintenance: machine cards, warehouse: warehouse, quality: quality system, foreman: production planning) and the order's owner are informed, and if there is nobody, the administrators. On the Andon tab a call is accepted (response time = acceptance − opening) and closed with a resolution note. Open calls appear in the "Attention" area of Pulse.

7. Live OEE

OEE = availability × performance × quality. Availability = running time ÷ (running time + unplanned downtime); performance = ideal time × total quantity ÷ running time (the ideal time is the unit time of the operation in the routing; at most 100% is used in the OEE product); quality = good quantity ÷ total quantity (total = good + rework + scrap). Example: 480 min planned time, 60 min downtime, 1 min/unit ideal, 380 units, 20 scrap → availability 87.5%, performance 90.5%, quality 94.7%, OEE 75.0%.

This measure is single-sourced with the Reports › Production › Machine utilisation and OEE report: both call the same calculation and give the same number for the same period. Live mode shows the current shift from its start until now; "Unrecorded time" is what remains of the elapsed shift after running and downtime are deducted and is not explained by any event (it does not enter OEE, it is made visible). The breakdown can be machine, station, shift, day or operator.

8. Production board and TV mode

The board draws a card for every machine: status colour (green running, amber paused, red down, grey idle), operator, today's OEE, the number of open Andon calls and today's order sequence (planned time, produced / planned, kit %, overdue badge). The kit percentage is the share of the order's remaining component lines that current stock can cover (the material-kit preparation flow is a separate job; here it is only shown). TV mode takes the board full screen (large type for 1920×1080) and refreshes every 10 minutes.

9. Downtime and scrap Pareto

The Pareto tab ranks the largest losses: for scrap the breakdown is reason, machine, product, operator or week; for downtime reason or machine (planned downtime can optionally be included). Rows within the cumulative 80% are drawn with a dark bar. Below, the top 5 scrap reasons of every week are listed. Product scrap is the quantity reported on the terminal with a reason code; scrap cards in the confirmation are kept in another unit and are not summed here.

10. Shift handover

The shift handover gathers everything that happened in a shift on one page: finished operations, jobs left half-done and still running, downtime, scrap, rework, Andon calls and handover notes. A note is written "to the next shift"; the next shift's handover page shows the previous shift's notes at the top. The PDF button converts the report to PDF through the message service (if the service is down, print from the browser). Shifts come from the HR shift definitions; if there are none, 08-16 / 16-24 / 00-08 is used.

An invalid day in the shift handover

If you type an invalid day (one that does not exist in the calendar or is out of range) into the date field of the shift handover screen, the field turns red and the result is not shown; the results of the previous day do not stay on the screen. You read the reason under the field.

11. Efficiency scorecard and piece-rate bonus

The scorecard gives running time, good quantity, scrap, units/hour, scrap % and OEE by operator, shift or machine. In the operator breakdown piece-rate bonus = piece rate × confirmed good quantity (last operation; the same part is not counted again on intermediate operations) and it is calculated only for staff whose pay type is piece rate. The piece rate is read from the Production › Employee card and is the same basis as confirmation labour — piece-rate staff get only quantity on the confirmation, hourly staff only time. The source is the terminal finish records.

12. On a phone

On a narrow screen the MES window becomes three tabs: Terminal (the same terminal — pairing, PIN, job selection, large buttons), Andon (open call cards for the supervisor, accept / close) and Board (machine cards in one column). Scanning with the camera needs the browser's BarcodeDetector support and HTTPS; otherwise use a hand scanner or type the code. The terminal does not work offline.

13. Permissions

PermissionWhat it opens
mesMES boards (users with the production module also see them)
mes_terminalOperator terminal device account
mes_tanimDefinitions of stations, tokens, reason codes, Andon recipients and the OEE target

14. Messages

CodeMeaning and what to do
MES_ISTASYON_MESGULA job is running on the station; finish it first (double start is blocked).
MES_OP_BASKA_ISTASYONDAThe operation is running on another station.
BLOKE_ACIKThe order has an open hold; resolve it in Stuck Work.
MES_JETON_GECERSIZThe station token was renewed or is wrong; get a new token in Definitions and pair the device again.
MES_TERMINAL_OTURUMThe terminal session dropped (4 hours idle, 12-hour cap or server restart); sign in again with the PIN.
EKSI_ONAY_GEREKLI …A confirmation gate; the terminal shows the approval button or the supervisor confirms from the desktop.
MES_CIHAZ_GECERSIZThe device has no station link or it was removed (signing in directly with the station token gives this error too); connect again from the Connect screen with the station code and the current token.
MES_CIHAZ_SURESI_DOLDUThe device was not seen for 180 days, so its link dropped; connect it again from the Connect screen.

Who can change the settings in this window

The company-wide settings in this window can be changed only by an Administrator. A user with the module right can see the setting, but Save is disabled and the reason (“Only an Administrator can change this company-wide setting — Settings › Users.”) is written next to the button. An empty or incomplete settings request does not reset the setting: an empty request returns 422 and a partial request changes only the setting that was sent. Details: Who can change company-wide settings.

PIN on the terminal: lock and change

The PIN of the operator terminal is the same account and the same counter as the staff portal: wrong attempts on the terminal and on the portal are counted together. The PIN is the staff portal PIN and has 4–6 digits. While changing the PIN, a wrong current PIN is refused with “Current PIN is incorrect; try again. After five wrong attempts, sign-in is paused for 15 minutes.” (401). After five wrong attempts sign-in is locked for 15 minutes, the terminal session is closed and the screen counts down the remaining time (“Too many wrong PIN attempts: sign-in with this employee number is paused. Time left: {sure}. Try again when it runs out, or ask HR to unlock it in Personnel › Portal accounts.”); HR unlocks it. While the lock lasts the PIN is not tried and the Retry-After header of the reply gives the remaining time. An employee whose user was deactivated cannot sign in at the terminal; the screen shows the same sentence as for a wrong PIN.

Related guides: Production · Stuck Work · Production Schedule (APS) · Work Centres · Reports · Mobile.

MES tabs on the phone

On the phone the Terminal, Andon, Board, OEE, Pareto, Shift handover and Productivity scorecard tabs are available (users with definition permission also get Stations).

Related guides