Contents
Controlled documents and the version chainApproval flow and the four-eyes ruleDistribution list and read acknowledgementPeriodic review and withdrawalInternal audit programme and checklistAudit standard, question bank and finding follow-upManagement reviewRisk and opportunity registerCAPA: source, due date and effectiveness verificationCertificate register and supplier certificate gateQuality manual and auditor packElectronic signatureDocument → mandatory trainingUsing it on the phoneQuality Management System: documents, audits, reviews, risks, certificates and CAPA
The Quality Management System window keeps the records ISO 9001:2015 needs in one place: controlled documents and read acknowledgements (7.5), the internal audit programme (9.2), management review (9.3), the risk and opportunity register (6.1), the certificate register and corrective/preventive actions (10.2). The same core also serves ISO 14001, ISO 45001, IATF 16949 and AS9100.
Window: Production › Quality Management System. Everyone sees the documents distributed to them on the My reading inbox tab and acknowledges them. Preparing documents requires the Documents permission; approvals, audits, reviews, risks, certificates and settings require the Quality management system permission (or system administrator).
Controlled documents and the version chain
Each document has a code, name, type (procedure, work instruction, form, manual, policy, plan, record, external document), process, owner and related standard clauses. Content can be written as text or attached as a file. The first version is draft rev A; a new revision requires a change description. A version that comes into effect makes the previous one obsolete; old versions are never deleted and stay as history. A withdrawn document cannot be changed and its code is not given to another document. External documents also keep the publisher and external version.
Approval flow and the four-eyes rule
Submit for approval moves the draft to review and a document version approval request appears in the Approvals list. The person who prepared the document or submitted it cannot decide; another quality officer chooses Approve and put into effect or Reject (a rejection note is required and the version returns to draft). If two people approve at the same time only one is recorded and the other gets a record-changed warning. The decision can also be given from the Approval Center with the same result.
Distribution list and read acknowledgement
Everyone, a department, a role or individual users can be added to the distribution list. People on the list see the effective version on the My reading inbox tab, open the text or file and press I have read and understood; the acknowledgement is recorded once with the person, time and address, and a second press does not create a new record. The document page shows who has and has not read it, with a percentage. People outside the distribution cannot open the document; the file is also given only to people on the list and only for the effective version. The Print button puts an UNCONTROLLED COPY watermark and the print date on every page.
Periodic review and withdrawal
Every document has a review period (12 months by default). The next review date is calculated from the effective date or the last review, appears in the company calendar and turns red in the list once it has passed. The document owner or a quality officer moves the date forward with Reviewed, no change needed; if a change is needed a new revision is opened. A document that will no longer be used is withdrawn with a justification; its effective version becomes obsolete and nobody is asked to read it any more.
Internal audit programme and checklist
The annual programme consists of process, date and auditor. Auditors cannot audit a process they are responsible for: the process owners on the Settings tab and the owners of effective documents in that process are rejected. The checklist is built from the selected ISO 9001 clauses; 22 ready questions are provided and the company can add its own. Each question is answered conforming, observation, minor, major or not applicable; a nonconformity needs a finding description. The audit cannot be closed while questions are unanswered or a minor or major finding has no CAPA.
Audit standard, question bank and finding follow-up
When planning an audit you choose the "Audit standard": ISO 9001:2015, AS9100D, AQAP-2110, IATF 16949, ISO 14001 or ISO 45001. AS9100D, AQAP-2110 and IATF 16949 build on ISO 9001, so the checklist combines the ISO 9001 questions with that standard’s additional questions (for example AS9100D 8.1.4 counterfeit part prevention, 8.5.1 foreign object (FOD), 8.5.1.3 first article inspection, 7.1.5.1 calibration register, 8.4.3 flow-down to external providers; AQAP-2110 GQA access, quality plan, configuration management, risk plan, no shipment with deviations without the acquirer’s permission). ISO 14001 and ISO 45001 audits use their own question sets, and clauses link to the Environment, OH&S and Assets / PPE screens. On each question line, the "Evidence screen" buttons open the screen where that clause is recorded.
In Internal audit › Question bank the questions are listed per standard; a user with quality management system permission adds, corrects or deactivates questions. Questions are never deleted: correcting the text or clause opens a new revision (Rev. 1, Rev. 2…), the old revision becomes inactive and the "Revisions" button shows the chain. The question text in audits already opened is frozen as it was and is not affected by later corrections. If two people correct the same question at the same time, one is saved and the other is asked to refresh the screen.
A minor or major finding cannot be closed without a CAPA; the CAPA source is recorded as "internal audit" together with the standard and clause number. When a new audit is planned for the same process, the not-yet-followed findings of earlier audits (minor, major, observation) are added at the top of the list as "Follow-up of previous finding" lines showing the earlier audit, its result and the CAPA stage. Choose Conforming if the finding is closed, Minor or Major if it continues; a recurring finding opens a new CAPA and is followed up again in the next audit. Follow-up lines in a cancelled audit do not count. The "Audit report" shows question, result, objective evidence, finding and CAPA link by clause and can be printed as PDF; in the management review inputs, audit results appear per standard (with recurring and open finding counts). If "Internal audit closure" is ticked in the electronic signature policy, the audit can only be closed with a signature. Only findings of completed audits are followed up: findings of an audit still in progress are not final and are not carried over; matching is by process name.
The built-in questions are not copies of the standards’ text; each is a short audit question linked to a clause number. Obtain the standard text from your certification body or the standard’s publisher and add your own questions to the question bank. AQAP-2110 additional requirements are mapped to ISO 9001:2015 clause numbers; if your company uses a different mapping, correct the clause to open a new revision.
Management review
When a meeting record is opened, the period inputs are collected automatically and frozen in the record: CAPAs opened, closed and open by source, actions found ineffective, internal audit results, customer feedback from support records, the suppliers with the most incoming inspection rejections, company quality objectives, high risks, documents overdue for review, expired certificates and open decisions from earlier meetings. Every decision is assigned as a task with an owner and due date; a CAPA can be opened from a decision when needed. The meeting is closed with an evaluation; a closed record cannot be changed.
Risk and opportunity register
Each record is a risk or opportunity in a process. Likelihood and impact are chosen from 1 to 5 with buttons; the score is their product and the level is coloured low, medium, high or critical. High and critical risks require an action, owner and due date; the action is assigned to the owner as a task. Entering residual likelihood and impact after the action shows how much the risk has dropped. A preventive CAPA can be opened from a risk. Product risks stay in the FMEA; only the FMEA link is written here.
CAPA: source, due date and effectiveness verification
There is no separate CAPA table: the record in Quality › NCR is the same one and both screens show it. Each CAPA has a source (product nonconformity, internal audit, customer complaint, supplier, risk, management review, process) and is flagged as corrective or preventive. A CAPA not about a product needs no stock code or quantity and has no MRB decision. A CAPA with an owner and due date is assigned to the owner as a task; a reminder comes before the due date, after it the task escalates to management, and an overdue CAPA line appears on the Boss Dashboard and in Pulse. The CAPA screen shows counts by source and stage and the age distribution in 0-30, 31-60, 61-90 and 90+ days.
Effectiveness verification is a separate step: after the action is written, a quality officer other than the CAPA owner records Found effective or Found ineffective with an evidence note. If it is ineffective the CAPA counts as reopened, a new task is opened for the owner and closing stays locked. A CAPA cannot be closed without effectiveness verification; the person who verified cannot close it, another authorised person does. In an unavoidable case a system administrator can close it with a justification, which stays on the record.
Certificate register and supplier certificate gate
The register holds company certificates (ISO 9001, ISO 14001, ISO 45001, IATF 16949, AS9100 and others), supplier certificates (with the business partner code) and product certificates (such as CE, SNI and TSE, with the stock code). Expiry and surveillance audit dates appear in the company calendar; certificates expiring soon or expired are coloured and enter the Boss Dashboard attention list. Inspection and calibration certificates from the maintenance module and staff training certificates are shown here read-only; they are not copied. The supplier certificate gate works on purchase orders and purchase invoices without an order: if none of the recorded certificates is valid, in Warn mode the record is saved with a warning and in Block mode it stops; a system administrator can proceed with a justification.
Quality manual and auditor pack
The manual shows clauses 4-10 of ISO 9001:2015 as a tree. Each sub-clause lists the effective documents that refer to it, the HNR screens where the record is kept (for example maintenance and calibration for 7.1, training for 7.2 and NCR for 8.7) and manually added evidence links. A clause without any link appears with a yellow warning. The auditor pack prints all clauses and links as one PDF; the printout carries a NOT OFFICIAL watermark and does not replace a certification body document.
Electronic signature
Before a ticked action in the signature policy is saved (controlled document approval, CAPA effectiveness check and closure, first article and PPAP approval, release from quarantine), the signature window opens. You re-enter your user name and password and, if the policy asks for it, the 6-digit code from your authenticator app. The window clearly shows the meaning of the signature (authored, reviewed, approved, released), and you can add an optional reason. When the action is saved, a digest of the record content is taken and the signature is bound to that digest together with your name, the server time and the meaning. On the document card the signatures are listed under each version; the people who prepare and review a version can also sign it with the Sign: authored and Sign: reviewed buttons.
If the record changes in any way after signing, the signature is not deleted but shows as Invalid (record changed after signing); if the signature row itself is altered it shows Invalid (signature value does not match). A wrong password or code uses up an attempt; after 5 failed attempts in a row that user is locked out of signing for 15 minutes. The same record cannot be signed with the same meaning twice within 60 seconds. On the Electronic signature tab you set up or remove your own verification code with a QR code; the system administrator changes the signature policy (which actions need a signature, who is asked for a code) and every change goes to the audit trail; a quality management system user sees the signature report filtered by date, user, record type, meaning and validity and can export it as PDF. The uncontrolled copy printout also carries the signature block.
This signature is designed according to 21 CFR Part 11 principles (re-authentication at signing, a digest bound to the record, meaning, time, an unalterable trail). It is not a qualified electronic signature (Turkish Law 5070 / PSrE) and does not replace a handwritten or qualified signature on an official document. That is why screens and printouts carry the NOT OFFICIAL note.
Document → mandatory training
In the Mandatory training box on the document card, a quality management system user marks that the document requires training, chooses who it covers (all staff, a department or a job) and how the requirement is closed: for simple documents a read acknowledgement is enough, for others a training record from the training catalogue is required. When the version takes effect the requirement is written to the training matrix and the completion period starts on that day; when a new revision takes effect, reads and trainings for the previous version no longer count and everyone reads the new version or takes the training again. The box lists the people who are not up to date; the Summary tab shows counts by department and My reading inbox shows each person their own document trainings. The training matrix on the Personnel screen shows the same calculation. When an internal audit starts, an automatic clause 7.2 question about training currency is added to the checklist, and the management review inputs show the number of people not up to date.
Using it on the phone
On a small screen the tabs become a scrollable strip, lists appear as cards and every button is large enough to press comfortably with a finger. In the reading inbox a document is opened and I have read and understood is given with one tap. The auditor goes through the checklist one question at a time: chooses the result button for each question, writes the evidence and finding and opens a CAPA if needed. On the CAPA screen effectiveness verification takes two steps: first Found effective or Found ineffective, then the evidence note.
Related guides
- Production Module — Guide from ScratchThis guide is written so that someone who has never used an ERP system can read it and run production on their own. Read it in order.
- Stuck Work Tracking — A Guide from ScratchOn the shop floor the most expensive job is the one left half-done and forgotten. The part sits at a machine; nobody knows "where is it, why is it stuck.
- MES — Operator Terminal, Live OEE and AndonMES (manufacturing execution) connects the shop floor to the office. The operator at the machine starts, pauses and finishes the job from a terminal.
- Engineering Change (ECN) and Product ConfiguratorThe Engineering window puts the product's technical definition (BOM, routing, technical drawing, work instruction) under control.
- Maintenance Management — Breakdowns, Preventive Maintenance, Spare Parts and MTBF/MTTRMachines, moulds, vehicles and plant equipment are tracked in this window as maintenance assets. Each asset gets a preventive maintenance plan (every N days.
- WIP and Plan vs Actual — Work in Progress, Bottlenecks, Overtime and the Weekly Plan vs ActualIt answers three questions in one place: how much work in progress (WIP) is waiting between operations and in front of which machine work is piling up.