Skip to content
HNROS Help Center
English
Start free
ContentsOpening a fileStages and ETAContainers, free time and demurrageFile costs and allocation basisArrival and goods receiptPosting to inventory cost and closingTürkiye and IndonesiaPermissions and alertsDate limits

Import file: stages, ETA, demurrage and allocating import costs to inventory

An import file tracks one shipment from an overseas supplier (container, LCL or air cargo) linked to open purchase orders end to end: its current stage, when it arrives, how much free time is left at the port and what the goods really cost once in the warehouse.

The file never writes orders, receipt notes or invoices: at arrival it opens a single shipping notice in Inbound Planning and goods are received there. The supplier invoice amount never changes; import costs are kept separately and added to inventory costing.

Opening a file

Use New file and pick the supplier; their open purchase order items are listed. Enter the quantities arriving with this shipment and, if known, each item's total weight and volume, HS code and duty rate. Quantities already assigned to other open files are deducted, so an item cannot be over-assigned. Delivery terms (Incoterms), B/L, vessel, ETD/ETA, free days, daily demurrage, file currency and rate are on the same screen; an empty rate takes the rate of the day.

Stages and ETA

Seven stages are tracked in order: order, loading, in transit, port arrival, customs declaration, customs release and warehouse. Each stage takes a planned and an actual date plus a document number; the actual date cannot be in the future or before the previous stage. If the ETA passes without a port arrival, the file warns. Port arrival starts the free time; the warehouse stage closes by itself with the goods receipt date.

Containers, free time and demurrage

Each container takes a number, type, seal and, if needed, its own free days; numbers failing the ISO 6346 check digit are flagged. Free time counts from the port arrival (or, as an estimate, from the ETA); after the last free day every day until gate-out or empty return is multiplied by the daily demurrage charge. A warning appears a few days before it ends and an action alert once it runs; alerts also show in the Owner Dashboard, Pulse and the company calendar.

File costs and allocation basis

Enter freight, insurance, customs duty, excise, brokerage, port, storage, demurrage, inland haulage and bank charges first as estimates and, when the invoice arrives, with the actual amount; a foreign-currency line with no rate takes the rate of the day. A line can be linked to an incoming purchase invoice (e.g. the forwarder's or broker's, including those created from invoice OCR drafts); one invoice links to one line. Each line is allocated to the items to the cent by a basis: freight by weight, insurance by value, customs duty by dutiable value (value × duty rate), storage by volume; if the basis has no data it falls back to value, then quantity, with a warning.

Import VAT (in Indonesia PPN impor and PPh 22 impor) is a deductible/creditable tax: it is not part of inventory cost, is not allocated and is shown separately under "Taxes not included in cost".

Arrival and goods receipt

In Goods receipt, "Send to Inbound Planning" opens one shipping notice (ASN) with the file's items; the B/L number travels as the supplier document. Sending again updates the same notice and does not change it once receiving has started. Dock appointment and receipt are done in Inbound Planning; the resulting receipt note appears in the file automatically. If goods were received outside the ASN, candidate receipt notes from the file's orders are listed and can be linked manually; a receipt note links to one file only.

Posting to inventory cost and closing

"Allocate to inventory cost" splits the file cost over the goods receipt items. The supplier invoice lines do not change; the allocated share is added to the purchase cost wherever inventory cost is read (period purchase average, stock valuation, product and customer profitability, price suggestion). If costs change later, re-allocate. Closing requires an actual amount on every line, a rate on foreign-currency lines and at least one goods receipt; the final allocation uses actual amounts and an estimated vs actual comparison by cost type and unit cost is kept. Only an administrator can reopen a closed file, with a reason. While the file is open, the price suggestion uses its expected unit cost for items with no cost history.

Türkiye and Indonesia

Cost types and declaration fields follow the company's country. In Türkiye customs duty, additional customs duty, special consumption tax (ÖTV), KKDF and stamp duty are part of cost, import VAT is not; the declaration keeps the customs office and procedure code. In Indonesia bea masuk, BMTP/BMAD, PPnBM and cukai are part of cost, PPN impor and PPh 22 impor are not; PIB fields (submission no, kantor pabean, jalur, SPPB, NDPBM, PPh 22 rate) are kept in the file and the PIB data set in Statutory Obligations is produced from these files. Submission to CEISA is manual or via a PPJK.

Permissions and alerts

Users with purchasing, costing or accounting permission see the files; opening and editing a file needs administrator or purchasing, allocating to inventory cost and closing also accept cost management permission. Every change is kept in the file's trail; a file is never deleted, only cancelled with a reason, and a file with received or allocated goods cannot be cancelled. If two people change the same file at once, the later save gets a "refresh and try again" message. ETA and last free day appear in the company calendar, running demurrage in the Owner Dashboard and Pulse.

Date limits

The date fields in this window follow the common date rule: transaction, plan and document dates may be at most 10 years before and 2 years after today; end, validity, due and expiry dates 10 years before to 50 years after; dates that reach back in time, such as installation, acquisition or loan start, may go back up to 100 years. A day that does not exist in the calendar (31.02.2026) or a year outside the range (1850, 9999) is refused with 422 and the message names the faulty field. Details: Date limits in other windows.

Related guides